Emergency Treatment For Concrete Pump Trucks Failures Part 8

Concrete pump truck malfunction:
The straight pipe of the conveying pipe burst.
Phenomenon and reasons:The straight pipe of the conveying pipe burst during construction on site, and there is no stock of non-standard straight pipes.
Emer...

Concrete pump truck malfunction:

The straight pipe of the conveying pipe burst.

Phenomenon and reasons:

The straight pipe of the conveying pipe burst during construction on site, and there is no stock of non-standard straight pipes.

Emergency elimination methods:

The standard for straight pipes in conveying pipes is 3 meters per pipe, but due to the length limitation of the boom, some optional straight pipes are installed on  pump trucks, and all straight pipes are not 3 meters per pipe. If a 2-meter straight pipe is damaged at this time and the warehouse only has a 2.5-meter straight pipe, it is only necessary to cut the 2.5-meter straight pipe by 0.5 meters and then weld it. This way, a 2-meter straight pipe can be made and used for construction site emergency.