Emergency Treatment For Concrete Pump Trucks Failures Part 22

Concrete pump truck malfunction:When the  concrete pump truck  is working, the insurance FU4 is always damaged.
Phenomenon and reasons:PLC controls the  concrete pump truck. When FU4 is replaced and powered on during ...

Concrete pump truck malfunction:

When the  concrete pump truck  is working, the insurance FU4 is always damaged.

Phenomenon and reasons:

PLC controls the  concrete pump truck. When FU4 is replaced and powered on during operation, the  concrete pump truck  will burn out, indicating a short circuit in line 38. After the FU4 insurance is damaged, it will cause the concrete pump truck to have no power supply installed, making the concrete pump truck unable to work.

Emergency elimination methods:

Remove all wires 38, 43, and 45 from the wiring terminals of the electrical control cabinet, and then install fuses. Connect the newly removed wires one by one, and install the fuse on the burnt wire to indicate a fault in the circuit. Install all remaining wires and test the machine. If it does not affect normal pumping, pump the concrete first.

1

Service is endless, focusing on  high quality used construction machinery, and professionally serving global customers, Mecha Brothers looks forward to cooperating with you and make a win-win development with you.

Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *